Scotland
Contact
VWS Westgarth Office Contact


Orbital House
3 Redwood Crescent
East Kilbride
G74 5PR
UK


Tel:
+44 (0)1355 588 000
Fax: +44 (0)1355 588 001

Web: www.vwswestgarth.com
Email: carol.easton@veolia.com

Veolia Water Oil & Gas Angola Contact:

Viana Park
Pavilhão nº1 Quarteirão 9
Estrada do Calumbo
Pólo Industrial de Viana
Luanda
República de Angola

Tel: +244 940 120 949
Tel: +244 949 229 399

Web: www.vwsoilandgasangola.com
Email: Enquiries.VWOGA@veoliawater.com

Buzzard (251,700 BWPD)

Process: Sulphate Removal

Client: Nexen Inc.

Country: United Kingdom

Contract Description: Supply of Sulphate Removal Package Module

Contract Date:December 2003

Contract Completion Date: April 2005

Capacity: 4 x 62,925 barrels/day

Sea Water Conversion: 75%

Sea Water Feed Quality: 35,670 mg/l (tds)

Product Water Output Quality: < 50 mg/l sulphate

Project Description:

Turnkey supply of a single lift module 251,700 BPD sulphate removal package utilising a membrane filtration pre-treatment system.

Process Description:

Seawater is treated by a membrane filtration system that will provide a complete barrier against particles larger than approximately 0.1 microns, thereby removing most species leading to SRP fouling.

4 x 62,854 BPD SR membrane arrays using Dow SR90-400 membranes provide the required low sulphate product flow.